Small stacks ride along
Six reels in Garden Grove or fifteen in Temecula don't need a truck of their own. A ride-along adds your stop to a run that is already going your way, so a small stack is collected without anyone paying for an empty deck. Most of our stops are ride-alongs.
How a ride-along works
Every run follows a lane: the 5 through Orange County, the 60 out to Pomona, the 15 over Cajon Pass. A run is planned around its larger stops, the ones that take a good share of the deck, and there is almost always room left over. A ride-along is your small stack filling that room. The truck is passing within a mile or two of you anyway; stopping for six reels adds a few minutes.
In practice, the rule of thumb is about a quarter of a deck. Below that, your stop rides along. A quarter of a deck is roughly 100 reels of 24 inches, 25 of 36 inches, 15 of 42 inches, 6 of 48 inches or 4 of 96 inches. Mixed stacks add up by share; the load planner does the sum and tells you which side of the line you are on.
Where ride-alongs wait least
Dense lanes with frequent runs. The ports lane, the Alameda Corridor, the San Gabriel Valley, the San Fernando Valley and the Orange County 5 lane all pass close to most addresses on them every time they run. Small stacks in Carson, Vernon, Santa Fe Springs, Sun Valley or Santa Ana rarely wait long.
Ride-alongs wait longer at the far ends of long lanes: Temecula at the bottom of the Riverside County lane, Redlands at the east end of the Inland Empire lane, Huntington Beach on the coast, and anywhere over Cajon Pass. There, the truck comes when a larger stop makes the drive worthwhile, and the small stacks ride with it.
On every lane, a ride-along is welcome: it is how a half-full truck becomes a full one.
What helps a ride-along
- Stage the reels by the gate or the street, where the driver can load them without manoeuvring a 53 foot trailer into a tight yard.
- Give a wide window. A ride-along fits around the run's bigger stops.
- Tell us if you can hand-load. Reels up to about 42 inches can be rolled up a ramp; larger ones need a forklift.
- Say if a neighbour has reels too. Two small stacks on one street can make a stop worth planning around.
Ride-along or part load?
A part load is a stop that takes a real share of the deck, roughly a quarter to most of it, and the run is planned around it. A ride-along is a stop the run fits in. The difference matters for timing: part loads set the date of a run, ride-alongs follow it. If your stack is near the line, tell us whether you would rather wait for a passing run or have one planned for you.
Six reels in Garden Grove
Fifteen 30 inch reels in Temecula take about 8% of a deck, also a ride-along, on the Riverside County lane when it reaches the south end. Four 72 inch reels from a Long Beach yard take 20%: still a ride-along, but close to the line.
- Ports and the 710
- Alameda Corridor and Vernon
- San Gabriel Valley and the 60
- San Fernando Valley, 5 and 118
- South Bay and the 405
- Orange County on the 5
- North Orange County, 91 and 57
- Inland Empire on the 10
- Riverside, the 215 and the 15 south
- High desert over Cajon Pass
- Antelope Valley and the 14
- Santa Clarita on the 5
Is your yard on a run?
These are the cities and districts our runs reach, by county. Each page names its lane, ZIP codes and the reels that usually come out of it.
Los Angeles County
- VernonD6
- CommerceD6
- City of IndustryF6
- Santa Fe SpringsE7
- Long BeachD8
- CarsonD7
- Rancho DominguezD7
- ComptonD7
- WilmingtonD8
- TorranceC7
- El SegundoC7
- Huntington ParkD6
- Northeast Los AngelesD6
- Sun ValleyC5
- PacoimaC4
- ChatsworthB4
- Canoga ParkB5
- Van NuysB5
- Santa ClaritaB3
- PalmdaleE2
- LancasterE1
- PomonaG6
Orange County
- AnaheimF7
- Santa AnaF8
- IrvineG8
- Huntington BeachF9
- Garden GroveF8
- FullertonF7
- OrangeG8
- Costa MesaF9
- TustinG8
- Buena ParkF7
Riverside County
San Bernardino County
Words on this page
- Ride along
- A small pickup added to a run that is already going that way, instead of a dedicated truck.
- Run
- One truck's pickup route for the day, stop by stop along a lane.
- Lane
- The freeway corridor a run follows, such as the 710 to the ports or the 15 to the high desert.
- Deck
- The flatbed or step-deck trailer floor; 102 inches wide on a California legal trailer.
- Part load
- A stop that takes a real share of a deck, roughly a quarter to most of it, so the run is planned around it.
- Pickup window
- The span of hours a dock is open and staffed for loading.
Read next
Ride-along questions
What is the smallest stack you will collect?
There is no hard minimum. Six reels is a normal ride-along; fewer can work if the truck is passing close by.
How long does a ride-along wait?
Until the next run on your lane, usually days. On the long lanes, the High Desert and the far end of Riverside County, it can be longer.
Can I make it come sooner?
Add more reels, or combine with a neighbour. A stop that takes a quarter of a deck or more gets planned on its own.