LA Wooden SpoolsReel pickup desk · 12 lanes Request a pickupRequest
Pickup · small stacks

Small stacks ride along

Six reels in Garden Grove or fifteen in Temecula don't need a truck of their own. A ride-along adds your stop to a run that is already going your way, so a small stack is collected without anyone paying for an empty deck. Most of our stops are ride-alongs.

How a ride-along works

Every run follows a lane: the 5 through Orange County, the 60 out to Pomona, the 15 over Cajon Pass. A run is planned around its larger stops, the ones that take a good share of the deck, and there is almost always room left over. A ride-along is your small stack filling that room. The truck is passing within a mile or two of you anyway; stopping for six reels adds a few minutes.

In practice, the rule of thumb is about a quarter of a deck. Below that, your stop rides along. A quarter of a deck is roughly 100 reels of 24 inches, 25 of 36 inches, 15 of 42 inches, 6 of 48 inches or 4 of 96 inches. Mixed stacks add up by share; the load planner does the sum and tells you which side of the line you are on.

Where ride-alongs wait least

Dense lanes with frequent runs. The ports lane, the Alameda Corridor, the San Gabriel Valley, the San Fernando Valley and the Orange County 5 lane all pass close to most addresses on them every time they run. Small stacks in Carson, Vernon, Santa Fe Springs, Sun Valley or Santa Ana rarely wait long.

Ride-alongs wait longer at the far ends of long lanes: Temecula at the bottom of the Riverside County lane, Redlands at the east end of the Inland Empire lane, Huntington Beach on the coast, and anywhere over Cajon Pass. There, the truck comes when a larger stop makes the drive worthwhile, and the small stacks ride with it.

On every lane, a ride-along is welcome: it is how a half-full truck becomes a full one.

What helps a ride-along

  • Stage the reels by the gate or the street, where the driver can load them without manoeuvring a 53 foot trailer into a tight yard.
  • Give a wide window. A ride-along fits around the run's bigger stops.
  • Tell us if you can hand-load. Reels up to about 42 inches can be rolled up a ramp; larger ones need a forklift.
  • Say if a neighbour has reels too. Two small stacks on one street can make a stop worth planning around.

Ride-along or part load?

A part load is a stop that takes a real share of the deck, roughly a quarter to most of it, and the run is planned around it. A ride-along is a stop the run fits in. The difference matters for timing: part loads set the date of a run, ride-alongs follow it. If your stack is near the line, tell us whether you would rather wait for a passing run or have one planned for you.

Six reels in Garden Grove

Plan view of a 53 ft flatbed with six 36 in reels 53 ft deck (636 in) 102 in Flat reels: 36 in stacked 3 high. Plan view, not to exact scale.
Six 36 inch reels take about 6% of a 53 ft deck. That rides along on the Orange County run on the 5. Estimate.

Fifteen 30 inch reels in Temecula take about 8% of a deck, also a ride-along, on the Riverside County lane when it reaches the south end. Four 72 inch reels from a Long Beach yard take 20%: still a ride-along, but close to the line.

Is your yard on a run?

These are the cities and districts our runs reach, by county. Each page names its lane, ZIP codes and the reels that usually come out of it.

Words on this page

Ride along
A small pickup added to a run that is already going that way, instead of a dedicated truck.
Run
One truck's pickup route for the day, stop by stop along a lane.
Lane
The freeway corridor a run follows, such as the 710 to the ports or the 15 to the high desert.
Deck
The flatbed or step-deck trailer floor; 102 inches wide on a California legal trailer.
Part load
A stop that takes a real share of a deck, roughly a quarter to most of it, so the run is planned around it.
Pickup window
The span of hours a dock is open and staffed for loading.

Read next

Ride-along questions

What is the smallest stack you will collect?

There is no hard minimum. Six reels is a normal ride-along; fewer can work if the truck is passing close by.

How long does a ride-along wait?

Until the next run on your lane, usually days. On the long lanes, the High Desert and the far end of Riverside County, it can be longer.

Can I make it come sooner?

Add more reels, or combine with a neighbour. A stop that takes a quarter of a deck or more gets planned on its own.

Request a pickup or a price

Tell us the count and the flange size; we will tell you if it fills a deck or rides along on the next run. Buying? Tell us the size and how many.

  • Mixed brands, nailed and bolted, part loads: all fine.
  • We answer by email with a pickup window or a price.
  • San Diego County is outside our area.
Pickup and buy requestBill of lading
What do you need? required

Pickup address

Shipper (your details)

An email address or a phone number, at least one.