LA Wooden SpoolsReel pickup desk · 12 lanes Request a pickupRequest
Map of lane 5, South Bay and the 405, drawn stop to stop over the freeways, with the other lanes faintSanta Monica BayPuente HillsVernonCommerceCity of IndustrySanta Fe SpringsLong BeachCarsonRancho DominguezComptonWilmingtonTorranceEl SegundoHuntington ParkNortheast Los AngelesPomonaAnaheimSanta AnaGarden GroveFullertonOrangeTustinBuena Park5ABCDEFG678Schematic. Grid squares about 9 by 10 miles; lanes drawn stop to stop.
Lane 52 areas on this lane
Freeways
Interstate 405405Interstate 105105Interstate 110110I-405, I-105, I-110
Starts
El Segundo, square C7
Ends
Torrance, square C7
Also reaches
Carson, Long Beach, Wilmington
Pickup lane 5 of 12 · 2 areas on the run

South Bay and the 405: the reel pickup lane

The South Bay lane follows the San Diego Freeway (the 405) from the 105 at El Segundo south through Hawthorne and Gardena to Torrance, and comes back up the Harbor Freeway (the 110). It serves aerospace campuses, refineries, business parks and contractor yards between LAX and the Palos Verdes hills.

Where the South Bay and the 405 run goes

El Segundo, at the top of the lane, packs a refinery, the Los Angeles Air Force Base and a dense band of aerospace and technology campuses into a few square miles beside LAX. South of it the 405 passes the industrial districts of Hawthorne, Lawndale and Gardena before reaching Torrance, which has its own refinery, business parks around Del Amo Boulevard and 190th Street, and light industry around Zamperini Field.

The return leg uses the 110, which puts the east side of Torrance and Carson within a few minutes. That is why South Bay stops and ports-lane stops often end up on the same deck.

The South Bay has two refineries, a major airport, an aerospace corridor along the 405 and El Segundo's office and data buildings, all packed into a few miles between the ocean and the 110. Each of those uses specialised cable and each is wired and rewired constantly. Utility work by LADWP on the Los Angeles side and by Edison in Torrance and El Segundo adds the larger reels.

The run sheet, stop by stop

StopAreaGridZIP codesFreewaysUsual flanges
1El SegundoC790245I-405, I-10524, 30, 42, 60 in
2TorranceC790501, 90502, 90503, 90504, 90505I-405, I-11024, 36, 48, 72 in

When the deck still has room, the run also takes stops in Carson (Ports and the 710 lane), Long Beach (Ports and the 710 lane), Wilmington (Ports and the 710 lane).

Where the reels on this lane come from

Aerospace and lab fit-outs
Data and control cable on 24 to 36 inch plywood and nailed reels, emptied by contractors in waves.
Refinery maintenance in El Segundo and Torrance
Instrument and power cable on 36 to 60 inch reels during turnarounds.
Business-park rewires
Tenants in Torrance and Gardena empty building-wire reels during improvements.
Utility and fibre work
Distribution and fibre crews along the 405 corridor leave larger reels at staging yards.

What the stops on this lane put out

Reel sizes along the South Bay and the 405 lane

FlangeSeen atEmpties per 53 ft deck (est.)Empty weight, lb
24 inEl Segundo, Torrance41623 to 24
30 inEl Segundo18939
36 inTorrance10264 to 77
42 inEl Segundo6090 to 100
48 inTorrance26 to 30106 to 177
60 inEl Segundo24 to 28187 to 347
72 inTorrance20 to 24204 to 592

Estimates from published reel and loading charts; method on reels per load.

What the driver needs to know on this lane

The 405 through the South Bay is among the busiest freeways in the country, and the stretch between the 105 and the 110 is slow for much of the day. Stops near LAX's cargo district and the refineries have gate procedures of their own, and the driver needs the site's instructions in advance. We usually work the South Bay mid-morning, after the commuter peak and before the afternoon build-up on the 405.

Small stacks ride along

South Bay sellers usually have small reels in modest numbers, which makes most stops here ride-alongs on a run that also takes a larger load from Carson, Long Beach or Wilmington. A laydown yard full of reels after a campus job is the exception, and may need a deck of its own.

How ride-along pickups work · Will my stack fill a deck?

Windows and timing on this lane

The 405 is slow most of the day between the 105 and the 110. We aim to load El Segundo early, before campus deliveries peak, and Torrance mid-morning. Campus docks have strict receiving hours and badge rules; tell us both when you book.

Request a pickup on this lane

The other lanes

Questions about the South Bay and the 405 lane

Do you collect from LAX?

Airport-side contractors and businesses just outside the airport, yes, where a flatbed can reach the reels. Airfield work is outside what we do.

Why do South Bay pickups sometimes come on the ports truck?

Because the return leg uses the 110, and the ports lane is minutes away. We put your reels on whichever run has the room.

Do you take data-cable spools?

Yes. Small plywood and nailed spools from data cable are common here and often resell to makers.

Do you collect from refinery contractors?

From their yards outside the refinery gates, yes. Inside a refinery, the operator's rules decide.

Is LAX part of the South Bay lane?

Businesses in the cargo district near the airport are, where reels can be loaded from the landside.

How do Torrance and El Segundo stops share a run?

The truck works El Segundo first, then follows the 405 or Hawthorne Boulevard south to Torrance.

Request a pickup or a price

Tell us the count and the flange size; we will tell you if it fills a deck or rides along on the next run. Buying? Tell us the size and how many.

  • Mixed brands, nailed and bolted, part loads: all fine.
  • We answer by email with a pickup window or a price.
  • San Diego County is outside our area.
Pickup and buy requestBill of lading
What do you need? required

Pickup address

Shipper (your details)

An email address or a phone number, at least one.