LA Wooden SpoolsReel pickup desk · 12 lanes Request a pickupRequest
Industry · usual flanges 24, 36, 48, 72, 96 in

Reels from fibre and broadband builds

Fibre builds empty reels by the hundred: fibre cable on plywood and nailed reels, and empty duct reels from the conduit it is pulled through. California's middle-mile network, city fibre projects and private builds are all in the ground across the region now, and their contractors' yards are full of empties.

Usual flanges
24 to 96 in
Areas it fills
6
Lanes
3

Fibre and broadband builds around Los Angeles

California is building a statewide middle-mile broadband network, about 421 miles of it in Los Angeles County, due by December 2026. Arcadian Infracom was selected to build more than 300 miles of middle-mile fibre in Los Angeles and San Bernardino counties. On top of that, cities are building their own: Huntington Park won a $25 million state grant to build about 50 miles of city fibre.

A fibre build uses two kinds of reel. The conduit, or duct, goes in first, delivered on large wooden reels of 48 to 96 inches. Then the fibre cable is pulled through it from smaller reels, often plywood. Both kinds are emptied in quantity as a project moves along a route.

A long fibre route moves its laydown yards as it goes, which means empties appear in different places month to month. Telling us where the next yard will be is the best way to keep the old one clear.

Where the reels pile up

Fibre contractors stage materials in yards along the routes they are building: in the Gateway Cities and South Los Angeles, along the 10 and the 60 into the Inland Empire, and in city-fibre towns such as Huntington Park. When a section is finished, the empties come back to the contractor's main yard, often in Ontario, Fontana or the San Fernando Valley.

What kind of reels

Large duct reels from 48 to 96 inches, mostly one-way and lighter than cable reels of the same size, and smaller plywood and nailed fibre reels of 24 to 42 inches.

How a pickup fits the work

Fibre reels come in waves as a route is built. We work with a contractor's schedule, clearing a yard between phases, and a recurring pickup suits a build that will run for months. Duct reels stack well on edge, so a full deck of them is efficient.

Where the reels go next

Empty duct reels are among the easiest large reels to place. They are light for their size, uniform in build, and popular with growers and ranches. Plywood fibre reels, if they have been kept dry, resell to makers and event buyers. Weathered or broken ones are recycled.

When the reels come off the job

Timing follows the route. Duct goes in first, and its empty reels pile up within weeks; fibre cable is pulled later, sometimes months later, and its smaller reels follow. A middle-mile build due by the end of 2026 is near its peak for both, and city builds like Huntington Park's run on their own grant schedules. We plan clear-outs around each contractor's phases rather than the calendar.

The usual mistake on fibre jobs is leaving empty duct reels lying flat in a yard to save space. Rain pools on the upper flange, the plywood or boards swell, and within a season a resalable reel has become scrap. Stand them on edge and chock them. The other is mixing in reels with cut duct still wound on; strip it, or tell us, because pipe adds weight and changes the plan.

A pickup, stop by stop

  1. Separate duct and fibre reels

    They are different sizes and go to different buyers.

  2. Count by flange

    Duct reels are usually 48 inches and up; fibre reels 24 to 42 inches.

  3. Give us the phase plan

    Tell us when sections finish and the yard needs clearing.

  4. Clear between phases

    Full runs for duct reels; fibre reels ride along with them.

Reel sizes from fibre and broadband builds

FlangeHow it loadsEmpties per 53 ft deck (est.)Empty weight, lb
24 inFlat, 4 high41623 to 24
36 inFlat, 3 high10264 to 77
48 inOn edge, two rows26 to 30106 to 177
72 inOn edge, two rows20 to 24204 to 592
96 inOn edge, two rows16 to 18250 to 1,199

Lanes that serve fibre and broadband builds

Other industries that empty reels here

Questions from fibre and broadband builds

Do you take empty duct reels?

Yes. They load on edge like any large reel, and Dura-Line's own chart shows how many fit a truck.

Are duct reels lighter than cable reels?

Often. Dura-Line's 96 inch duct reel weighs about 250 lb; a heavy 96 inch cable reel can weigh over 1,000 lb.

Can you keep up with a long build?

A recurring pickup on the lane the build follows is the usual answer.

Do plywood fibre reels resell?

Dry, clean ones do, to makers and event buyers.

Who builds the middle-mile network?

The state’s programme uses contractors and partners such as Arcadian Infracom. We collect from the contractors’ yards, not as a partner of the network.

Do fibre reels pile up in cities?

Yes. City fibre projects like Huntington Park’s stage reels in town, close to the routes they are building.

What sizes are fibre cable reels?

Usually 24 to 42 inches, plywood or nailed. Duct reels are bigger.

Do you take reels from telecom maintenance crews?

Yes, from their yards, by the stack or by the deck.

Request a pickup or a price

Tell us the count and the flange size; we will tell you if it fills a deck or rides along on the next run. Buying? Tell us the size and how many.

  • Mixed brands, nailed and bolted, part loads: all fine.
  • We answer by email with a pickup window or a price.
  • San Diego County is outside our area.
Pickup and buy requestBill of lading
What do you need? required

Pickup address

Shipper (your details)

An email address or a phone number, at least one.