LA Wooden SpoolsReel pickup desk · 12 lanes Request a pickupRequest
Industry · usual flanges 24, 36, 48, 60, 72, 96 in

Reels from data-centre construction

A data centre is mostly power: feeders, busway, generator and switchgear cable, and miles of data cable. Building one empties hundreds of reels, from 24 inch data spools to 96 inch medium-voltage reels. Vernon has two large projects, and El Segundo and other cities host more.

Usual flanges
24 to 96 in
Areas it fills
4
Lanes
2

Data-centre construction around Los Angeles

Vernon has become one of the region's data-centre locations. Prime Data Centers opened its LAX01 building there in November 2024: three storeys, 242,495 square feet and 33 MW of critical IT power at full build-out. Goodman Group broke ground in 2025 on a 49.5 MW data centre on part of the former Farmer John site. Both sit on a city with its own electric utility and plenty of industrial land.

Data centres take cable in huge quantities. Medium-voltage cable brings power in from the utility; feeders and busway carry it through switchgear, UPS systems and generators to the halls; and data and fibre cable connects the racks. Each kind comes on its own reels, and the empties come off the job steadily as each phase is fitted out.

Data-centre construction also runs in phases long after the shell is finished: each new data hall, generator yard or power upgrade is fitted out in turn. A building that is already open may still be emptying reels for years.

Where the reels pile up

On site, in the electrical contractor's laydown area, and later in the contractor's own yard. In our area that means Vernon above all, with El Segundo's office and data buildings on the South Bay lane and data rooms in business parks across Orange County and the Inland Empire.

What kind of reels

Every size. Data cable on 24 and 30 inch spools; feeders on 36 to 48 inch nailed reels; medium-voltage cable on 60 to 96 inch bolted reels, often returnable.

How a pickup fits the work

Data-centre sites are strict about access, so pickups are booked through the contractor with gate times, badges and safety orientations. We clear laydown areas between phases, in full runs for the big reels, with the small spools riding along.

Where the reels go next

Data-centre reels tend to be in good condition because the work is indoors and the sites are tidy. That makes them easier to resell: data spools to makers, nailed feeder reels to contractors and growers, and one-way medium-voltage reels to ranches and heavy users. Returnable reels go back to their owners first.

When the reels come off the job

Timing follows the build. Medium-voltage cable and switchgear go in early, and the biggest reels come off then; feeders and busway follow as halls are fitted out; data cable comes last and keeps coming as tenants move in. A contractor who tells us the phase plan up front can have the laydown area cleared as each stage ends, without waiting on a full yard.

The usual mistake on data-centre jobs is mixing returnable and one-way reels in the same laydown row. When the truck comes, someone has to read every stencil before anything loads. Keep a separate row for each owner's returnables from the start, and keep data spools on pallets under cover.

A pickup, stop by stop

  1. Book through the contractor

    Site access, badges and gate times come from the electrical contractor.

  2. Split returnables

    Medium-voltage reels are often stencilled and returnable; set them aside.

  3. Count by flange

    Small, medium and large reels load differently; counts by size let us plan the deck.

  4. Clear by phase

    We clear each phase's empties so the laydown area is free for the next.

Reel sizes from data-centre construction

FlangeHow it loadsEmpties per 53 ft deck (est.)Empty weight, lb
24 inFlat, 4 high41623 to 24
36 inFlat, 3 high10264 to 77
48 inOn edge, two rows26 to 30106 to 177
60 inOn edge, two rows24 to 28187 to 347
72 inOn edge, two rows20 to 24204 to 592
96 inOn edge, two rows16 to 18250 to 1,199

Lanes that serve data-centre construction

Other industries that empty reels here

Questions from data-centre construction

Do you work inside data-centre sites?

Only under the site's rules, booked through the contractor, with the badges and orientation it requires.

Which data-centre reels resell?

Sound one-way reels of all sizes; data spools especially.

Do you name data-centre owners as customers?

No. We name projects only as places where reels come from.

How many reels does a data-centre phase empty?

It varies widely. Send counts by size and we will plan the runs.

Do El Segundo data buildings produce reels?

Yes. Fit-outs and power upgrades there go out on the South Bay run.

What is the biggest reel on a data-centre job?

Usually 72 to 96 inch medium-voltage reels, often bolted and returnable.

Can a data-centre contractor set up recurring pickups?

Yes, phase by phase, on the lane the site is on.

Request a pickup or a price

Tell us the count and the flange size; we will tell you if it fills a deck or rides along on the next run. Buying? Tell us the size and how many.

  • Mixed brands, nailed and bolted, part loads: all fine.
  • We answer by email with a pickup window or a price.
  • San Diego County is outside our area.
Pickup and buy requestBill of lading
What do you need? required

Pickup address

Shipper (your details)

An email address or a phone number, at least one.